Schematic
Previous Schematic | Next Schematic
Schematic Details:

PropertyValue
NameDeed for: Heavy Natural Gas Processor
CategoryInstallation Deed
Skill NeededInstallations IV: Heavy Harvesters
Complexity30 - Requires Specialized Crafting Tool and Private Crafting Station
Schematic Size10
Resources Needed22,705
XP Gained3800
XP Per Resource0.17
TypeRegular
ManufacturedYes
Crate SizeSingles only
Quality level High Quality
ScreenshotsNo screenshots - Add Screenshot
Server groups
Shopping List:

9,640 Metal
8,250 Low-Grade Ore
1,175 Chemical
1,000 Aluminum
940 Steel
500 Carbonate Ore
500 Copper
400 Reactive Gas
300 Non-Ferrous Metal
Resource List:

  1. Requires 355 units of Chemical
  2. Requires 6,500 units of Metal
  3. Requires 1,050 units of Low-Grade Ore
  4. Requires 400 units of Steel
  5. Requires 600 units of Low-Grade Ore
  6. - Requires 2 identical Turbo Fluidic Drilling Pump Unit
    1. Requires 120 units of Chemical (Total:240)
    2. Requires 60 units of Metal (Total:120)
    3. Requires 240 units of Chemical (Total:480)
    4. Requires 120 units of Steel (Total:240)
    5. Requires 150 units of Metal (Total:300)
  7. - Requires 4 identical Small Structure Storage Module
    1. Requires 80 units of Metal (Total:320)
    2. Requires 50 units of Steel (Total:200)
  8. - Requires 2 identical Generator Turbine
    1. Requires 200 units of Reactive Gas (Total:400)
    2. Requires 500 units of Aluminum (Total:1000)
    3. Requires 50 units of Chemical (Total:100)
    4. Requires 150 units of Non-Ferrous Metal (Total:300)
    5. Requires 250 units of Carbonate Ore (Total:500)
    6. Requires 50 units of Steel (Total:100)
    7. Requires 250 units of Copper (Total:500)
  9. - Requires 3 similar Wall Module
    1. Requires 100 units of Metal (Total:300)
    2. Requires 200 units of Low-Grade Ore (Total:600)
    3. Requires 200 units of Metal (Total:600)
    4. - Requires 10 similar Structural Module
      1. Requires 100 units of Low-Grade Ore (Total:3000)
      2. Requires 100 units of Low-Grade Ore (Total:3000)
      3. Requires 50 units of Metal (Total:1500)
Experimental Properties:

  • Experimental Efficiency
    • Extraction Rate
      Heat Resistance25%
      Shock Resistance25%
      Unit Toughness50%
  • Experimental Storage
    • Hopper Size
      Malleability33%
      Unit Toughness66%
Additional info:

This deed can be used to place a heavy gas harvester

Best resources for:



Current resources:


Chemical: No resource available
Metal: No resource available
Low-Grade Ore: No resource available
Steel: No resource available
Low-Grade Ore: No resource available

All resources:


Chemical: No resource available
Metal: No resource available
Low-Grade Ore: No resource available
Steel: No resource available
Low-Grade Ore: No resource available

Used in Schematics:



No schematics found


Comments:

You must be logged in to add comments.